Planned Pole Placements in Right of Way (Drawings)
A cross-section of the corridor, looking south, of where Section 49 34.5kV line and Section 80 115kV line are located now in CMP’s 150-foot right of way and where the new line will be constructed. Distances are measured in feet.
A cross-section of the corridor, looking south, of where CMP’s Section 80 115kV line is located now in our 150-foot right of way and where the new line will be constructed. Distances are measured in feet.